Designing and implementing a Mitsubishi PLC-based SCADA system needs a thorough approach. Initial considerations include the range of the project, the nature of data to be tracked, and the intended level of control. A well-defined system architecture is crucial for ensuring efficient data gathering from the field. This involves choosing appropriat